BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//HDP User Group - ECPv6.10.1.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://hdpusergroup.org
X-WR-CALDESC:Events for HDP User Group
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20170312T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20171105T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART:20170123T160000Z
DTEND:20170123T170000Z
DTSTAMP:20260501T060805
CREATED:20190111T174725Z
LAST-MODIFIED:-00011130T055036Z
UID:10950-1485165600-1485169200@hdpusergroup.org
SUMMARY:High Freq. Meas. Phase 3
DESCRIPTION:
URL:https://hdpusergroup.org/event/high-freq-meas-phase-3-4714/
CATEGORIES:High Frequency Measurements Phase 3
END:VEVENT
BEGIN:VEVENT
DTSTART:20170123T180000Z
DTEND:20170123T190000Z
DTSTAMP:20260501T060805
CREATED:20190111T174703Z
LAST-MODIFIED:-00011130T055036Z
UID:10921-1485172800-1485176400@hdpusergroup.org
SUMMARY:First 2017 Meeting for the X-ray Tomography Signal Integrity Project
DESCRIPTION:We should have a full meeting. v     The university researchers will have developed a few slides showing how they calibrate their system. v     Dr Simon and his group will have prepared cross-sections to substantiate the dimensional measurements presented. v     Dr Simon and his group will have carried out some electrical measurements with a Vector Network Analyzer (VNA) to compare the S parameter results obtained by inputting the 3D x-ray measured dimensions and the materials properties into the CAD model and then into the EM Field Simulator.   There was some discussion about what to do next: go to the package level (suggested by Dr. Simon) or look at something like press fit connectors (suggested by Mike).  The former may not be looked at fondly by component manufacturers as this is getting close to reverse engineering.  Further discussion is required.  Phase 2 of the project maybe? 
URL:https://hdpusergroup.org/event/first-2017-meeting-for-the-x-ray-tomography-signal-integrity-project-4624/
CATEGORIES:X-Ray Tomography Signal Integrity
END:VEVENT
END:VCALENDAR